Custom Garage Interiors in St. Louis

Find our content useful?

Remodeling project including epoxy floor, cabinets, workbench, slatwall and overhead storage with bike racks

A custom garage interior is the whole room finished as one job: the floor, the walls, the storage and the lighting, specified together so they match and installed in one visit rather than four. The floor runs $6 to $10 per square foot installed, the storage is packaged from $2,500, and a full interior takes 2 to 5 days on site. Garage Designs of St. Louis has been remodeling garages in Fenton and across the metro since 2002.

Above: the Leitner garage in Fenton. 700 square feet, epoxy floor, custom cabinets, slatwall and overhead storage, finished in four days. See the full case study.

Planning one now? Start with the epoxy floor, because it is the only part of the room that has to go in before anything else gets mounted. Or call 314-308-7780 for a free in-home estimate.

The four parts of a garage interior

Almost every garage interior is some combination of four things. You do not need all four, but the order matters, and getting it wrong is the most expensive mistake in this work.

  1. The floor, ground and coated first, because everything else fixes to the walls above it.
  2. Slatwall, to get the bikes, tools and sports gear off the floor.
  3. Cabinets and overhead racks, for whatever is left.
  4. Lighting, last, and the part most people skip.

1. The floor goes in first

Light gray flake epoxy and polyaspartic garage floor photographed from inside the garage with the door open

The slab is ground with a diamond grinder, cracks are repaired, then a Floorguard HyperBond base coat goes down, a full flake broadcast on top of that, and an Aspartic 85 polyaspartic topcoat to seal it. Priced by the square foot that comes to $6 installed for the Good build, $8 for Better with a moisture barrier under it, and $10 for Best with a second topcoat over it. Every one of the three carries a limited lifetime residential warranty against peeling and delamination.

It goes first because cabinets, slatwall and racks all fix to the walls and ceiling above it. Once the cabinets are on the walls, grinding means masking every one of them and working in the gaps, and the dust still finds its way in.

The slab is where the surprises are. On the Reiff garage in Clayton we found concrete that was breaking up, so the repair came before any coating, and the 200 square feet still finished in a single day. A coating will not fix a slab that is still moving. Put one over a crack that is still opening and it hides it until spring.

2. Slatwall carries what is on the floor

Gray slatwall panels holding two bicycles, balls, yard tools, a golf bag and a storage bin above a gray flake epoxy floor

Slatwall is a grooved panel fixed across the studs. Hooks, baskets and brackets slide into the grooves and move whenever you want them to, which is the difference between it and a row of screwed-in hooks. Bikes, yard tools, golf clubs and sports gear come off the floor, and that is usually what makes a two-car garage hold two cars again.

3. Cabinets and overhead racks take the rest

White and gray custom garage cabinets with a countertop and slatwall behind, above a flake epoxy floor
Black overhead ceiling storage racks holding cardboard boxes, black bins, a spare tire and paint buckets

Custom garage cabinets are made to the measured length of the wall, so the run finishes flush instead of stopping nine inches short. Base cabinets take the heavy and the ugly, tall units take long-handled tools, and a countertop across the top turns into the workbench. Overhead storage racks hang from the ceiling joists and hold what you touch twice a year: bins, seasonal decorations, a spare set of tires.

4. Lighting is the part people skip

Finished two-car garage interior lit by recessed ceiling downlights, with dark cabinets, an under-cabinet lit workbench and a gray flake epoxy floor

A single bulb on the opener throws one shadow across the whole room, which is why a garage can have a new floor and still look unfinished. A grid of recessed downlights or LED shop lights takes the shadow out, and a strip fixed under the cabinets puts light on the bench itself, where your hands are. We install lighting and electrical roughly 12 times a year, usually as part of a larger interior. There is more detail in the guide to garage lighting.

What a custom garage interior costs

Two numbers matter. The floor is priced by the square foot. Everything else is priced as a package.

PackagePriceWhat it adds
GoodFrom $2,500Epoxy floor coating
Better (most popular)$2,500 to $5,000Adds decorative flake, slatwall and full overhead storage
BestFrom $5,000The complete interior, custom cabinets included

The floor on its own runs $6 to $10 per square foot installed. A 500 square foot two-car garage therefore lands between $3,000 and $5,000 for flooring alone, and the packages above cover the storage that goes in around it. Every quote is given before work starts, and the price quoted is the price paid.

How long it takes, from six real garages

Six garage interiors finished across the St. Louis metro, with the square footage, what went into each one, and the days spent on site.

WhereSizeWhat went inOn site
Fenton700 sq ftEpoxy floor, custom cabinets, slatwall, overhead storage4 days
LadueFull interiorDrywall repaired, painted two-tone, epoxy floor, slatwall and shelving5 days
Des Peres800 sq ftNon-slip epoxy flake, after drywall and window reframing2 days
Kirkwood550 sq ftTidal Wave polyaspartic flake system2 days
Ballwin800 sq ftEpoxy flake with extra non-slip additive for a home gym2 days
Ladue800 sq ftEpoxy flake system installed before move-in2 days

Two days is the common case for a floor on a sound slab. Four or five days is what a full interior takes once cabinets, slatwall and drywall are in the scope.

When not to do the whole interior

Three times I tell people to do less than they came in for:

  • The slab is moving. Repair is its own job and it comes first. A finish over a crack that is still opening is money spent on hiding it.
  • You are selling the house. The floor is what changes how the garage shows. Cabinets and slatwall are worth it in a garage you are going to keep using.
  • Water is getting in. Find where it comes from first. New drywall and a coated floor do not stop water, they sit in front of it.

And one honest limit on the four parts above: this is a garage remodel, not a conversion. Plumbing, structural changes and turning a garage into permitted living space are separate trades, and I would tell you that at the estimate rather than halfway through.

Common questions

Two numbers, and they are set out in the table above. The floor is charged by the square foot, $6 to $10 installed. Everything else comes as a package: from $2,500 for a coated floor, $2,500 to $5,000 for the build most people choose, which adds flake, slatwall and overhead racks, and from $5,000 once custom cabinets are in it. A 500 square foot two-car garage is the size most people ask about.

Two days for a floor on a sound slab. Four to five days for a full interior. Of the six recent jobs listed above, four finished in two days and the two full remodels took four and five.

No. Most people start with the floor and add storage later. The one thing worth deciding early is whether slatwall and cabinets are coming, because the floor should go in before they are mounted, not after.

We measure the space, ask what you keep in there and how you use it, then lay out where the cabinets, slatwall and racks go. You do not need a plan before you call. You need the room and a rough idea of what has to fit in it.

Yes, though it adds time. The floor needs the room clear to grind and coat, so anything staying gets moved to one side and back, or into the driveway for the two days. If you say up front what is in there, the quote stays accurate.

Slatwall panels and overhead racks are within reach of a confident homeowner with a stud finder and someone to hold the other end. The floor is the one I would leave alone. A coating is only as good as the grinding under it, and a kit rolled over a sealed or damp slab lifts in sheets, which means grinding back to bare concrete before anyone can start again.

Who builds it

“I got bids from some closet organizing companies, but they just didn’t get it. Garage Designs listened to what I wanted and provided solutions.”

I am Brandon Coleman. I joined Garage Designs in 2014 installing epoxy floors, moved into full remodels in 2021, and bought the company in May 2023, so I learned this work here before I owned it. When I quote a garage I measure it, check the slab, and tell you which of the four parts your room actually needs.

The company has been remodeling garages in St. Louis since 2002, works out of 772 Merus Ct., Fenton, MO 63026, and is accredited by the Better Business Bureau, or BBB, since 2008. Insulation, drywall and paint go in two to three times a month as part of a larger remodel, and lighting and electrical about once a month.

What to do next

Call 314-308-7780 or request a free in-home estimate. You get the garage measured, an answer on what the slab needs, a layout for where the storage goes, and your price before any work starts. We are open Monday to Friday, 8 AM to 5 PM.

If you want to see more finished work first, the case studies have photographs and the details of each job, and the garage remodeling page lays out the packages in full.


A Guide to Garage Optimization

Free download

A Guide to Garage Optimization

Our own planning guide covering flooring, cabinets, slatwall and overhead storage, and the order to do them in.

Get the free guide